place of investment Poland - City of Lubań
installed capacity (kw/mw) 8 MW
project cost (gross, in euro) Approx. EUR 2 000 000
project type Communal
number of users of generated energy 60% of Lubań community
type of energy resource replaced Coal
start of operation 2001
financial sources 43% donation (EkoFundusz)
20% credit (WFOŚiGW)
investor District Heating Provider Lubań Sp. z. o. o.
contractor Various contractors, own realization
THE PROJECT

The main goals of the investment starting in 1997 were to reduce the air pollution caused by coal combustion in boilers, to limit the heat consumption of the city and to provide the new ecological technology of heat production from straw combustion.

The investment was implemented in two phases.

The first phase of the project between 1997 and 1999 included the following actions: Construction of the straw-fired boiler (total power 1 MW) with a straw warehouse (800 m2) Purchasing of the special press with tractor for straw reception and delivering it to the boiler

  • Liquidation of 7pcs 748 kW boilers and construction of 7 heat exchanger distribution centres with heat connections
  • Modernization of 28 heat distribution centres with a total power of 12 400 kW
  • Construction of the straw-fired boiler (total power 1 MW) with a straw warehouse (800 m2)
  • Purchasing of the special press with tractor for straw reception and delivering it to the boiler
The second phase of the programme was implemented in 2000- 2001 and included:
  • The construction of a boiler house with a total install power of 7 MW (two straw firing boilers, type WCO 160 S - 3.5 MW) containing the technological equipment, also boiler house building and straw warehouse (1 000 m2)
  • Purchasing of two high squeeze press assemblies with tractor

TECHNOLOGY

The three straw firing boilers (two of them type WCO 160 S) have a total installed capacity of 8 MW.

At Lubań the heat distribution centres were modernized through installing automatic heat control systems. The heat network was enhanced with the use of pre-insulation pipes (their current share is 51%). The boiler houses can use coal boilers as well as split straw boilers. Total installed power amounts to 8 MW with efficiency of 84%.

In addition, the heated buildings indoor installations were partially modernized, conducted by administrators.

Moreover, during the realization of the straw boiler houses project a special group of cooperating companies was created including ZUK Stąporków, “Waryñski-Toruñ" Sp.z.o.o., Ecoinstal Koœcian and REKA AS.

The total amount of heat sale per year is 7 000 000 PLN.

back

ECONOMIC ASPECTS

The total cost of the project amounted to 6 397 800 PLN. Of this 43% was financed by a donation from EcoFund Foundation (EkoFundusz) the revenues of which consists of the funds received from the Polish-debt-for-environment-swap Scheme pursuant to agreements signed by Poland with the USA, France, Switzerland, Italy and Norway. Another 20% was given as a credit by The Voivodeship Fund for Environmental Protection and Water Management (WFOŚiGW).

Compared to the previous system, the price stabilization of services could also be achieved through the investment.

back

SOCIAL EFFECTS

During the investment the project's media coverage was on a national level. 2 000 people have visited the heating system since the start of operation. The project increased the periodic job demand (mainly in the summer season) and created two new permanent jobs also connected to the biomass demand.

The heating costs could be reduced by 15% for the final consumers. The implementation of the technology created real system using biomass as potential source of energy.

The following information has been given to people interested in the project:

  • 10 topical conferences organized
  • a few dozen participations in national and international conferences
  • 3 information brochures published
  • several master's theses written

back

ENVIROMENTAL EFFECTS

me. 1997 1998 1999 2000 2001 2002 2003
Amount of heat production from straw GJ - 84 6 725 14 038 30 836 55 819 54 824
Straw consumption t - 9 718 1 345 2 831 5 578 5 069
Amount of heat production from hard coal Gj 200 275 200 191 161 334 147 382 146 331 118 339 117 654
Coal consumption t 10 470 11 827 9 781 7 822 7 734 6 099 5 965

Structure of the fuel conversion

type of pollution emission per year before (t/y) emission per year after (t/y) environmental impact absolut value (t/y) environmental impact relative value (%)
so2 72,1 19,1 68,0 10 573,2
no2 2,8 14,0 4,2 0,0
particulate matter 69,3 5,1 63,8 10 573,2
co2 96,1 26,7 93,8 100,0

back

DIFFICULTIES, PROBLEMS

The main difficulties connected to the project were problems with the organization of the biomass (straw) supply - because the supply system had to be built up first - the increasing costs of obtaining biomass and that there are no visible effects of straw firing implementation on tangible profits in CO2 emission trading.

back

FURTHER INFORMATION

PEC Lubań S.p.z.o.o.
Pl. 3 Maja 11

Krzysztof Kowalczyk

Tel: 0 75 722 43 79 w. 25 - 0 602 186 113
E-mail: pecluban_dti@op.pl

back

Examples to Follow - Successful and Sustainable Energy Investments in the Central-Eastern and South-Eastern European Region - Energia Klub